OEM Shenzhen Advanced CNC Grinding with Nitriding (Gas) & Shot Peening Carbon Steel Magnesium Alloy Stainless Steel Gear Hub Bushing Connector Industrial Stud

Still deciding? Get samples of $ !
Order Sample

Product Description

📋 Basic Information
Model NO. OEM Energy Source Electric Arc
Material Copper, Aluminum, Brass, Stainless Steel Tolerance 0.01+/- 0.005mm
Roughness Ra0.2-Ra3.2 Drawing Format STP, STEP, IGS, IGES, X_T, SAT, STL
Quality Assurance ISO9001:2015, SGS, CE Quality Control 100% Inspection Before Shipment
Production Type Precision CNC Machining Parts Delivery Time Sample: 7 Days; Mass: 15-45 Days
Surface Finish Anodized, Plate, Powder Painting, Polish Production Ability 150,000 Pieces Per Day
📦 Packaging & Delivery
Package Size 30.00cm * 30.00cm * 30.00cm Gross Weight 20.000kg
Packing Method EPE, Plastic Bag, Bubble Bag or Custom Package in Carton
⚙️ Product Description
CNC Machining Banner
CNC Part 1
CNC Part 2
CNC Part 3
CNC Part 4
CNC Part 5
CNC Part 6
CNC Part 7
CNC Part 8
CNC Part 9
Frequently Asked Questions
Are you a manufacturer or a trading company?
We are an industry and trade-oriented enterprise specializing in design, development, production, and sales, dedicated to customized precision CNC machining services.
How can I get a quote?
Please provide 2D or 3D drawings (PDF, STEP, IGS, DWG, etc.) including material specifications, dimensions, tolerances, surface treatments, and quantities. We typically offer a quotation within 24 hours.
Can I get a quote without drawings?
Yes, we can provide an accurate quotation based on your physical samples, detailed pictures, or drafts with comprehensive dimensions.
Will my drawings be kept confidential?
Absolutely. We prioritize customer privacy and are happy to sign a Non-Disclosure Agreement (NDA) to ensure your designs are protected.
How do you control product quality?
Our quality control process includes: (1) Raw material inspection, (2) First-article production inspection, (3) Sampling during production, and (4) 100% final inspection by QC before shipment.
What is the typical lead time?
Generally, samples take 5-7 days, while mass production orders typically require 3-4 weeks depending on complexity and quantity.

Related Products